10 Business Day Kitchen Program
Terms & Conditions
1. Layout Requirements
• Kitchen must remain the same basic footprint and layout.
• No relocation of plumbing, gas lines, appliances, load-bearing walls, or structural components.
• Cabinet configuration must match existing layout.
2. Countertops & Backsplash
• Countertops must be solid surface material (quartz, granite, or approved solid surface product).
• Backsplash must be solid surface.
• Specialty tile, intricate patterns, or extended cure-time materials are excluded.
3. Electrical
• No electrical changes permitted.
• No new circuits, panel upgrades, fixture relocations, or added outlets.
• Existing electrical must be code compliant at time of project start.
4. Plumbing
• No plumbing relocation.
• Replacement of fixtures allowed only in existing locations.
• Existing plumbing must be functional and code compliant.
5. Flooring
• Flooring must be Luxury Vinyl Plank (LVP) only.
• Subfloor must be level and in serviceable condition.
• Tile, hardwood, or specialty flooring systems are excluded.
6. Homeowner Cooperation & Site Access
• Full access to the home during agreed work hours.
• Kitchen area must remain vacated during work hours.
• No minor children may be home alone during construction hours.
• Pets must be secured away from work zones.
• Driveway access required for deliveries and debris removal.
7. Selections & Materials
• All selections must be finalized prior to contract execution.
• All materials must be ordered, delivered, inspected, and in Contractor possession prior to project start date.
• No mid-project material or design changes permitted.
8. Permits & Inspections
• Required permits must be secured prior to project start.
• Inspection scheduling must not delay workflow.
• Delays caused by third-party agencies extend the timeline accordingly.
9. Scope Limitations
• Painting limited to kitchen walls and ceiling only.
• No custom carpentry or built-ins.
• Appliances must be on site if being replaced.
• Structural modifications are excluded.
10. Interior Passage Doors & Base Trim
• Replacement or installation may be included where feasible.
• Not guaranteed to be completed within the 10-business-day timeline package.
• Considered secondary finish components.
• May be completed immediately following the 10-day kitchen completion milestone without constituting delay.
11. Dry Rot, Hidden Damage & Hazardous Materials Disclaimer
• Timeline contingent upon no discovery of dry rot, concealed damage, mold, pest damage, or structural deterioration.
• Additional time and cost apply if hidden conditions are discovered.
• Timeline contingent upon absence of asbestos-containing materials or hazardous substances.
• (As part of our preliminary process, we test for asbestos prior to beginning the project.)
• Licensed abatement required if hazardous materials are identified.
• Any abatement or clearance delays extend the timeline.
Commitment to Efficiency:
Contractor will maintain high efficiency, coordination, and workforce allocation to minimize delays once corrective work is completed.
12. Payment Terms
• Progress payments must be made according to contract schedule.
• Payment delays may result in schedule delays.
• Timeline guarantee contingent upon timely payments.
Definition of 10-Day Completion
The 10-business-day timeline applies to completion of a functional kitchen consistent with the agreed scope. Items outside defined scope, material delays, hidden conditions, third-party inspection delays, or homeowner-caused delays extend the completion timeline accordingly.
Our Commitment
At 10 Day Kitchens, our mission is simple: build your dream kitchen quickly, efficiently, and with minimal disruption to your life. Our accelerated scheduling, coordinated trades, and disciplined workflow are all designed around that promise.
10 Business Days to a Brand New Kitchen.
Ready to get started? Build a space you’ll love without the long-term renovation stress.